Проект

Fahleite Waste Facility

Възложител
Aurubis Bulgaria AD
Местоположение
Pirdop, Bulgaria
Период на реализация
May 2016 – June 2017
Роля на „Главболгарстрой“ в проекта
Prime contractor
Характер на работите

The project envisages an extension of the existing tailings pond for storage of fayalite waste, consisting of two cells – A and B, of a total living area of 446,6 decares, which will be built in 8 stages up to the height of the existing landfill. The cells are surrounded by earth-dykes, protected by an insulating screen and equipped with drainage systems.