Administrative building of Air Traffic Control Center

Contracting Authority:
Chief Directorate of “Air Traffic Control Centre”, Sofia Airport

Location:
Sofia, Bulgaria

Period of implementation:
December 1998 – March 2001

Technical characteristics:
• Total built-up area”: 40,000 square meters
• Technical data according to the following standards: BS; DIN; EU; ASTM; ASA and ISO and ISO 9001 – Quality Standard
• Engineering systems managed by BMS (Building Management System), etc.

rvd cover