Aspen Golf Resort

Contracting Authority:
MRI

Location:
Razlog, Bulgaria
Period of implementation:
September 2006 – September 2007

Glavbolgarstroy’s role in the project:
Prime contractor

Nature of works:
• „Construction on “turnkey” basis of a complex, consisting of 12 low-storey residential buildings, located in two groups with provided recreation area, children playgrounds, green areas, swimming pool and bar, parking, platforms and underground parking lot
• Architectural and construction-assembly works
• Installation works
• Luxury finishing works on „turnkey” basis

Technical characteristics:
Total built-up area: 22,000 square meters

Aspen