Facility for Fahleite Waste at Aurubis Bulgaria

Contracting Authority:
Aurubis Bulgaria AD

Location:
Pirdop, Bulgaria

Period of implementation:
May 2016 – June 2017

Glavbolgarstroy’s role in the project:
Prime contractor

Nature of works:

The project envisages an extension of the existing tailings pond for storage of fayalite waste, consisting of two cells – A and B, of a total living area of 446,6 decares, which will be built in 8 stages up to the height of the existing landfill. The cells are surrounded by earth-dykes, protected by an insulating screen and equipped with drainage systems.

 

aurubis