Orthodox Heritage Center

Contracting Authority:
OAO Gazprom

Location:
Village of Peredelkino, Russia

Period of implementation:
April 1999 – July 2002

Glavbolgarstroy’s role in the project:
Prime contractor

Nature of works:
• Construction of a complex of building with unique architecture – the main building, the interior, facade and the roof have the typical forms of the Russian architecture of the 17-18th century
• Engineering systems
• Planning and landscaping

Technical characteristics:
• Monolithic 4-storey building with a multifunctional basement, a swimming pool and winter garden; decorative facade and facade lighting, wall paintings, art masonry, rectangular and circular domes;
• Auxiliary buildings – greenhouse, winter garden, gas-distribution unit, transformer substation, garages, office building, artesian wells, monolithic arbour, fence with towers with built-in decorative wall-panels.