Reconstruction and extension of Specialized Hospital for Active Treatment St. Ekaterina

Contracting Authority:
Specialized Hospital for Active Treatment “St. Ekaterina”

Location:
Sofia, Bulgaria

Period of implementation:
2002 – 2003

Glavbolgarstroy’s role in the project:
Prime contractor

Nature of works:
• Turnkey based construction
• Reconstruction of Specialized Hospital for Active Treatment “St. Ekaterina” – blocks 1 and 2
• Finishing works: facade and interior
• Computerization of all working places and connection with the main hospital computer
• Landscaping of the areas surrounding the building, accesses, ladder ramps, coverings and greening
• Building engineering systems

Certain technical characteristics:
• Total built-up area: 2,880 square meters;
• Functional diagnostics sectors;
• Medical-subsidiary sectors (pharmacies);
• Economic and serving sectors;
• Training and administrative sector

ekaterina