Rehabilitation of Sofia Central Railway Station

Contracting Authority:

National Railway Infrastructure Company

Location:
Sofia, Bulgaria

Period of implementation:
August 2013 – March 2016

Glavbolgarstroy’s role in the project:
Prime contractor

Nature of works:

The Project is implemented within the Operational Programme on Transport 2007-2013 (OPT). The scope of the implemented activities is design and construction in parts: Architectural, Structural, Interior and furniture, Plumbing, HVAC, Renewable energy systems, Electrical – high voltage installation, Electrical – low voltage installations, Equipment and facilities, Energy efficiency, Fire safety, Landscaping, Road works, Planting, Railway and waterproofing of the pedestrian tunnel, Unified trains management center, centenary and related equipment, Construction Management Project and Health and Safety Plan.

Certain technical characteristics:

The main objective of the project is to undertake rehabilitation of the existing reception building to the train station and its adjacent areas, which is managed and maintained by NATIONAL RAILWAY INFASTRUCTURE COMPANY and is situated in the largest and most important for the country economically developed urban agglomeration.

A full reconstruction and rehabilitation of the building and areas surrounding platforms are implemented.