Residential Building Rose Valley

Contracting Authority:
ITALSTROY

Location:
Sofia,  Bulgaria

Period of implementation:
April 2017 – December 2017 г.

Glavbolgarstroy’s role in the project:
Prime contractor

Nature of works:

• „Turnkey“ structural, construction and installation works
• Vertical planning
• Electrical installations, high voltage and low voltage.

Certain technical characteristics:
Total built-up area: 3247 square meters

DSC3091 HDR3 Panorama