Project

Aspen Golf Resort

Contracting Authority
MRI
Location
Razlog, Bulgaria
Period of implementation
September 2006 – September 2007
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works

• „Construction on “turnkey” basis of a complex, consisting of 12 low-storey residential buildings, located in two groups with provided recreation area, children playgrounds, green areas, swimming pool and bar, parking, platforms and underground parking lot
• Architectural and construction-assembly works
• Installation works
• Luxury finishing works on „turnkey” basis

Technical characteristics

Total built-up area: 22,000 square meters