Reconstruction and extension of Specialized Hospital for Active Treatment St. Ekaterina
Contracting Authority
Specialized Hospital for Active Treatment “St. Ekaterina”
Location
Sofia, Bulgaria
Period of implementation
2002 – 2003
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works
• Turnkey based construction
• Reconstruction of Specialized Hospital for Active Treatment “St. Ekaterina” – blocks 1 and 2
• Finishing works: facade and interior
• Computerization of all working places and connection with the main hospital computer
• Landscaping of the areas surrounding the building, accesses, ladder ramps, coverings and greening
• Building engineering systems
Technical characteristics
• Total built-up area: 2,880 square meters;
• Functional diagnostics sectors;
• Medical-subsidiary sectors (pharmacies);
• Economic and serving sectors;
• Training and administrative sector