Project
Training Base Sport Palace
Contracting Authority
Natsionalna Sportna Baza EAD
Location
City of Varna, Kabakum locality
Period of implementation
May 2005 – May 2011
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works
• Reconstruction and modernization of hotel facilities
• Construction and assembly works
• Luxury finishing works
• Landscaping and vertical planning
• Construction of an outdoor stadium with an athlete running track
• Reconstruction of the indoor 5-corridor swimming pool and stands with 231 seats
• Construction of a walkway between the indoor pool and hotel area
• Renovation of 3 training rooms
• Construction of two outdoor swimming pools and 4 tennis courts
• Cross path with a length of 737 meters.