Project
Facility for Fahleite Waste at Aurubis Bulgaria
Contracting Authority
Aurubis Bulgaria AD
Location
Pirdop, Bulgaria
Period of implementation
May 2016 – June 2017
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works
The project envisages an extension of the existing tailings pond for storage of fayalite waste, consisting of two cells – A and B, of a total living area of 446,6 decares, which will be built in 8 stages up to the height of the existing landfill. The cells are surrounded by earth-dykes, protected by an insulating screen and equipped with drainage systems.