Lions’ Bridge
Contracting Authority
Sofia Municipality
Location
Sofia, Bulgaria
Period of implementation
March 2013 – March 2015
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works
- Drawing up an investment project (phase – work project);
- Reconstruction of the existing crossroad by construction of a new three – levels transport hub for three types of transport – motor, tram and metro;
- Execution of structures: two direct roadways tunnels and two roundabout bridges;
- Reconstruction of engineering infrastructure: including sewer, water pipe system, heating system, reconstruction of single-flow cables, reconstruction of overhead system, electricity supply system, telecommunications;
- Road works at size load 11.5 t/axis of the road surface, including reconstruction of tramway. Landscaping, including automated irrigation system;
- Restoration, preservation, artistic and spectacular lighting of Lavov most and throughout its range.
- Actions on coordination and approval of the work project with the specialized control authorities, exploitation companies and the consultant;
- Receiving of Building permit;
- Temporary construction;
- Delivery of the necessary materials, equipment and furniture;
- Construction-assembly works;
- Single, complex and 72-hour tests;
- Drawing up of diligent and executive documentation;