Project

Strandzha Gas Metering Station

Contracting Authority
Bulgartransgaz EAD
Location

from Strandzha compressor station to the border with the Republic of Turkey

Period of implementation
2018 – 2019
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works

Investment design, construction and commissioning of the stage: DN1200 transmission line with a length of 11km from the Bulgarian-Turkish border to Strandzha gas metering station and a connection to the Transit gas pipelines TG1 and TG2.