Struma Highway, Lot 1

Contracting Authority
Road Infrastructure Agency
Location

Dolna Dikanya - Dupnitsa, from km 305+220 to km 322+000

Period of implementation
01.10.2011 – 01.09.2013
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works

Lot 1 of Struma Highway has a length of 16.780 km, starting from the end of the completed stretch Daskalovo – Dolna Dikanya at km 305+220 and ending at km 322 +000.

The construction of the road stretch includes construction of 15 (fifteen) large facilities, including – two agricultural underpasses, one agricultural overpass, five multi-opening bridges, the highest of which is a 26-meter viaduct.

Technical characteristics

The dimensions of the Highway are А-29, including:
– 2х2 traffic lanes – 2 х (2х3.75) = 15 meters
– 2х2 main asphalt lanes – 2 х (2х0.75) = 3 meters
– 2х1 emergency halt lanes – 2 х 2.50 = 5 meters
– 2х1 banquet – 2 х 1.25 = 2.50 meters
– median dividing lane = 3.50 meters
Total: 29 meters

Traffic category – extremely heavy