Project

Air Traffic Control Tower at Sofia Airport

Contracting Authority
State enterprise “Air Traffic Control”
Location

Sofia Airport

Period of implementation
August 2011 – July 2012
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works

Detailed design and „turnkey” construction

Technical characteristics
  • Total built-up area: 2 400 square meters.
  • The building height – 50 meters.
  • The project includes precise design and layout of the general plan, functional setting job seats for the operating room, the area for air traffic services and meteorological services, the requirements for review to the runway for takeoff and landing (runway) and approaches onto the open observation deck, etc.
  • An analysis determining the jobs of controllers and the procedure for locating items in the control room of the new airport control tower.