Project
Bourgas Summer Theatre
Contracting Authority
Bourgas Municipality
Location
Bourgas, Bulgaria
Period of implementation
November 2006 – August 2007
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works
- Construction of membrane roof of the summer theatre in Bourgas
- Construction-assembly works,
- Metal structures
- Supply and assembly of movable membrane,
- Driving systems for the movable membrane;
- New electro installations, illuminating and sound systems;
- Vertical planning
Technical characteristics
Movable membrane roof, type “FLUOTOP 1502″