Project

Riviera Beach Hotel

Contracting Authority
Riviera JSC
Location

Golden Sands Resort, Bulgaria

Period of implementation
December 2001 – June 2002
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works
  • “Turnkey” re-engineering and construction of 4* Riviera Beach Hotel
  • Luxury finishing works
Technical characteristics
  • Total built-up area: 16,200 square meters
  • Outdoor water areas: 750 square meters
  • The hotel part includes: three high bodies, low body for connection to the existing hall and Riviera Restaurant, as well as a walkway to the swimming pool
  • Reception foyer: administrative block with reception desk, cocktail bar, souvenir shop, business center, vertical communication connections to the hotel part and the conference block
  • Irish pub
  • Balneological centre, including gym, medical office and 8 chambers for electric radiation
  • 2 outdoor swimming pools, for children and adults, an indoor swimming pool
  • Conference hall
  • “Silent” games hall with 3 pool tables and video games