Project
Subsection №1 from km 366+000 to km 366+720, including serving tunnel road at the Northern portal of Zheleznitsa tunnel
Contracting Authority
Location
The section is part of “Struma” Motorway, starting at km 366+000 and ending at km 366+720 of the motorway. The site is located in Blagoevgrad district.
Period of implementation
Nature of works
Design and construction of Subsection №1 of “Struma” motorway Lot 3.1 tunnel “Zheleznitsa”, from km 366+000 to km 366+720, including service tunnel road at the northern gate of tunnel “Zheleznitsa”. The total length of the section is 720 m and the gauge is 29 m. The project includes design and construction of bridge structures over Struma river, road I-1 (Е-79) line Sofia – Kulata, fourth-class road BLG 1071, as well as the design and construction of a service tunnel road at the northern tunnel portal.
The design and construction of Lot 3 of “Struma” motorway is the main project under Priority Axis 2 of Operational Program “Transport and Transport Infrastructure” 2014-2020, co-financed by the EU Cohesion Fund.
Project No. BG16M1OP001-2.001-0001 “Struma Motorway” Lot 3 – Lot 3.1, Lot 3.3. and tunnel “Zheleznitsa”.
“Design and construction of the Struma motorway Lot 3.1 “Zheleznitsa” tunnel with three lots: Lot 1: Subsection №1 from km 366+000 to km 366+720, including a tunnel service road at the northern portal of “Zheleznitsa” tunnel.
Prime contractor
“Zheleznitsa-Sever”
Partners: GBS Infrastructural Construction AD, Glavbolgarstroy AD, Glavbolgarstroy International EAD
Consultant / Engineer under the contract
TES Consult
Partners: “STROL 1000” AD, “TRI-ES” EOOD, “EXPERT DESIGN” OOD
Sources of funding
Cohesion Fund of the EU
National co-financing
Managing authority
Coordination of Programs and Projects Directorate Ministry of Transport, Information Technology and Communications