Project

Connecting gas pipeline between Chiren UGS and Butan

Contracting Authority
Bulgartransgaz EAD
Location

Chiren UGS - Butan village

Period of implementation
May 2023 – October 2024
Glavbolgarstroy’s role in the project
Main contractor
Nature of works

Investment design, procurement of necessary materials and equipment, construction, and commissioning of a connecting gas pipeline between the Chiren underground gas storage facility and the existing gas transmission network operated by "Bulgartransgaz" in Butan village.

Technical characteristics

The pipeline spans approximately 41.432 kilometers, designed to withstand a pressure of 75 bar, equipped with a pipe diameter of 711 mm.