Project
Port Grain Terminal
Contracting Authority
"Logistic Center - Varna" EAD
Location
Beloslav, Bulgaria
Period of implementation
December 2023 - December 2024
Glavbolgarstroy’s role in the project
Main contractor
Nature of works
The project for the construction of a port grain terminal includes seven sub-sites:
- Silage farm with truck unloading;
- Vertical layout and flooring;
- Railway line with railway unloading;
- Warehouse;
- Parking for heavy goods vehicles;
- Road interchange and adjacent infrastructure;
- Quay wall – railway, piles, and other construction and assembly works;