Project

Port Grain Terminal

Contracting Authority
"Logistic Center - Varna" EAD
Location

Beloslav, Bulgaria

Period of implementation
December 2023 - December 2024
Glavbolgarstroy’s role in the project
Main contractor
Nature of works

The project for the construction of a port grain terminal includes seven sub-sites:

  • Silage farm with truck unloading;
  • Vertical layout and flooring;
  • Railway line with railway unloading;
  • Warehouse;
  • Parking for heavy goods vehicles;
  • Road interchange and adjacent infrastructure;
  • Quay wall – railway, piles, and other construction and assembly works;