Project

Biovet Peshtera

Contracting Authority
BIOVET
Location

Peshtera, Bulgaria

Period of implementation
May 2017 – April 2019
Glavbolgarstroy’s role in the project
Prime contractor
Nature of works

5 separate projects:

  1. Plant for manufacture of pharmaceutical products and fodder supplements with 12 subprojects with a total build-up area of over 25 000 m2,
  2. Logistic center with a total built-up area of 8 500 m2,
  3. Electrical supstation 110 kV with a total built-up area of 1 580 m2,
  4. Installation for instant granulation with three subprojects with a total built-up area of 9 600 m2,
  5. Reconstruction of a hotel and
  6. Reconstruction of WWTP with 400 000 PE.